HR 1390 · in committee · niche
Ocean Pollution Reduction Act II
- climate
What this bill does
- The bill creates an alternative permitting process for San Diego's Point Loma Wastewater Treatment Plant to meet federal water pollution standards.
- The EPA and City of San Diego are affected, along with residents relying on the plant's wastewater treatment.
- The plant must meet specific pollution limits and produce 83 million gallons daily of safe water by December 31, 2039.
Generated by claude-haiku-4-5
Community Threads
Started by Cosponsor
- 01
What trade-offs between construction costs and timeline does San Diego face in meeting the 2039 deadline for the Point Loma plant's pollution standards?
- 02
How would this alternative permitting process differ from standard EPA requirements, and what accountability measures ensure the plant meets its pollution limits?
- 03
Which communities near Point Loma could be most affected by changes to wastewater treatment operations during the transition to meet new standards?
Cosponsor writes these to seed civic discussion — they aren't user posts. Sign in to reply.

Sponsor · D-CA-50
Scott H. Peters
Citizen cosponsors
0
In Congress
4/ 435
House Reps cosponsoring
Introduced 2025-02-14
Joining the bill
Legislative timeline
2025-02-14 · house · Committee
Referred to the Subcommittee on Water Resources and Environment.
2025-02-14 · house · IntroReferral
Referred to the House Committee on Transportation and Infrastructure.
2025-02-14 · IntroReferral
Introduced in House
2025-02-14 · IntroReferral
Introduced in House

Citizen comments
Sign in to comment on this bill.
No comments yet — be the first.